Experimenting on optimism bias and cost overruns
28 August 2020
The aim of this project is to identify the interactions and links between the planning fallacy and optimism bias, by looking at possible ways to mitigate the effects of cost and schedule overruns in the context of project estimations. This will be done through online experiments involving a few questionnaires and a 3D building tool.
Keywords
Ethical approval
UCL Research Ethics Committee Approval ID Number: 15749/001
About the researcher
My name is Giuseppe Sassano, I am a PhD student at University College London. For any information about participating in the study or on the research please do not hesitate to contact me!